🚨 Fix CI/CD: PR Automation & Validation (Run #19630) - #11493
Conversation
Automated failure analysis for workflow run #19630 Summary: - Workflow: PR Automation & Validation - Failed Jobs: 1 - Run: #19630 - Timestamp: 2026-04-10 13:09:34 UTC This commit contains: - Detailed failure analysis report (CI_FAILURE_REPORT.md) - Machine-readable failure data (workflow_failure_details.json) 🤖 Auto-generated by JARVIS CI/CD Auto-PR Manager
Automated failure analysis for workflow run #19622 Summary: - Workflow: PR Automation & Validation - Failed Jobs: 1 - Run: #19622 - Timestamp: 2026-04-10 13:07:20 UTC This commit contains: - Detailed failure analysis report (CI_FAILURE_REPORT.md) - Machine-readable failure data (workflow_failure_details.json) 🤖 Auto-generated by JARVIS CI/CD Auto-PR Manager
💡 PR Description Suggestions |
📊 PR Size AnalysisSize: Review Checklist
|
🚨 CI/CD Failure DetectedThe PR Automation & Validation workflow failed for this PR. Action RequiredA tracking PR has been automatically created to help resolve this issue: Quick LinksPlease review the analysis and implement the suggested fixes. 🤖 Auto-generated by JARVIS CI/CD Manager |
There was a problem hiding this comment.
2 issues found across 2 files
Prompt for AI agents (unresolved issues)
Check if these issues are valid — if so, understand the root cause of each and fix them. If appropriate, use sub-agents to investigate and fix each issue separately.
<file name="CI_FAILURE_REPORT.md">
<violation number="1" location="CI_FAILURE_REPORT.md:20">
P2: The failure is miscategorized as `timeout`; the updated log evidence indicates a PR-title validation error instead.</violation>
</file>
<file name="workflow_failure_details.json">
<violation number="1" location="workflow_failure_details.json:9">
P1: The updated `pr_title` is still not Conventional Commits compliant, which can cause the PR title validation job to fail again.</violation>
</file>
Reply with feedback, questions, or to request a fix. Tag @cubic-dev-ai to re-run a review.
| "fix_branch": "fix/ci/pr-automation-validation-run19622-20260410-130719", | ||
| "pr_title": "\ud83d\udea8 Fix CI/CD: PR Automation & Validation (Run #19622)", | ||
| "fix_branch": "fix/ci/pr-automation-validation-run19630-20260410-130934", | ||
| "pr_title": "\ud83d\udea8 Fix CI/CD: PR Automation & Validation (Run #19630)", |
There was a problem hiding this comment.
P1: The updated pr_title is still not Conventional Commits compliant, which can cause the PR title validation job to fail again.
Prompt for AI agents
Check if this issue is valid — if so, understand the root cause and fix it. At workflow_failure_details.json, line 9:
<comment>The updated `pr_title` is still not Conventional Commits compliant, which can cause the PR title validation job to fail again.</comment>
<file context>
@@ -1,12 +1,12 @@
- "fix_branch": "fix/ci/pr-automation-validation-run19622-20260410-130719",
- "pr_title": "\ud83d\udea8 Fix CI/CD: PR Automation & Validation (Run #19622)",
+ "fix_branch": "fix/ci/pr-automation-validation-run19630-20260410-130934",
+ "pr_title": "\ud83d\udea8 Fix CI/CD: PR Automation & Validation (Run #19630)",
"analyses": [
{
</file context>
| "pr_title": "\ud83d\udea8 Fix CI/CD: PR Automation & Validation (Run #19630)", | |
| "pr_title": "fix(ci): Validate PR Automation & Validation (Run #19630)", |
| | # | Job Name | Category | Severity | Duration | | ||
| |---|----------|----------|----------|----------| | ||
| | 1 | Validate PR Title | timeout | high | 5s | | ||
| | 1 | Validate PR Title | timeout | high | 3s | |
There was a problem hiding this comment.
P2: The failure is miscategorized as timeout; the updated log evidence indicates a PR-title validation error instead.
Prompt for AI agents
Check if this issue is valid — if so, understand the root cause and fix it. At CI_FAILURE_REPORT.md, line 20:
<comment>The failure is miscategorized as `timeout`; the updated log evidence indicates a PR-title validation error instead.</comment>
<file context>
@@ -3,21 +3,21 @@
| # | Job Name | Category | Severity | Duration |
|---|----------|----------|----------|----------|
-| 1 | Validate PR Title | timeout | high | 5s |
+| 1 | Validate PR Title | timeout | high | 3s |
## Detailed Analysis
</file context>
🚨 CI/CD Failure Alert
The PR Automation & Validation workflow failed on branch
fix/ci/pr-automation-validation-run19622-20260410-130719.Summary
713990cFailed Jobs
1. 🔴 Validate PR Title
Failed Steps:
Suggested Fixes:
Next Steps
Auto-Fix Attempts
This workflow will automatically attempt common fixes based on the failure type.
🤖 Auto-generated by JARVIS CI/CD Auto-PR Manager | Configuration
Summary by cubic
Updates the CI failure report and machine-readable details to reflect PR Automation & Validation run #19630. Replaces stale run #19622 data with current URLs, timestamps, duration, and log matches to keep triage accurate.
Written for commit b89df8c. Summary will update on new commits.