Skip to content

cimas sync 2026-08-10 wave (3-week drift catch-up + standoc-models P3) - #1

Merged
github-actions[bot] merged 1 commit into
mainfrom
cimas-sync-2026-08-10
Aug 11, 2026
Merged

cimas sync 2026-08-10 wave (3-week drift catch-up + standoc-models P3)#1
github-actions[bot] merged 1 commit into
mainfrom
cimas-sync-2026-08-10

Conversation

@opoudjis

Copy link
Copy Markdown
Collaborator

Fortnightly cimas sync wave 2026-08-10 (previous 2026-07-22, 3 weeks overdue).

Wave-scale context

97 of 137 mapped repos have accumulated drift. Key changes this wave:

  • standoc-models P3 monorepo consolidation (metanorma-core#16 / metanorma/ci#390): 16 metanorma-model-* entries collapsed into 1 standoc-models entry.
  • mn-samples-plateau docker.yml unmap (metanorma/ci#388): restored @strogonoff's local Firelight customizations after inadvertent cimas-sync strip on mn-samples-plateau#536.
  • ci#375/#376 supersedes (metanorma/ci#383 / #384 / #385 landed 2026-08-07): reusable workflow shape updates.
  • gh-actions/model/Makefile verify-images defensive check (ci#302 / #303): applied uniformly across model repos.
  • Various minor drift: rubocop-todo inherit fix, release.yml bundle install fix (both from prior wave 2026-07-22).

What to review on this repo

The branch diff shows what cimas synced from current templates. If any change is a clobbered opt-out (per-repo customization that shouldn't have been stripped), flag it and I'll unmap that file in cimas.yml — see the mn-samples-plateau#537 remediation pattern for the shape of the fix.

Non-scope

  • Individual template design changes (those go through their own PRs into metanorma/ci first).
  • Wave-scale meta-issues (release scheduling, cadence): tracked via the metanorma/ci queue.

🤖

Fortnightly cimas sync wave 2026-08-10. 97 of 137 mapped repos have
accumulated drift over 3 weeks since last wave (2026-07-22). Key changes:
standoc-models P3 monorepo entry (metanorma-core#16 / ci#390),
mn-samples-plateau docker.yml unmap (ci#388), ci#375/#376 supersedes
(ci#383/#384/#385), gh-actions/model/Makefile verify-images defensive
check (ci#302/#303).

request-checks: true
@opoudjis
opoudjis requested a review from ronaldtse August 11, 2026 11:31
@github-actions
github-actions Bot merged commit a3596dc into main Aug 11, 2026
6 of 7 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants